feat(orchestrator): W2 Kanban board with swimlanes and forecast
Tasks gain a Kanban board: columns Waiting, Running and Done, swimlanes P1 to P4+ and Unpinned by WSJF, after-dependency arrows and the dashed queue line; drag and drop stages status, pin and dependency moves that apply with one passkey. The burn chart gets the trend and a forecast. Committed below the bar on the operator's word 2026-11-12 (no further per-bundle tests, one gate after the merge): the W2 e2e never ran. 🎯 Fix: 80 % 💥 Break: 10 % 💸 Cost: 100 % ⏱️ Time: 100 % 🛡️ Security: 100 % 🏆 Score: 72 🚦 Gate: ⛔ fix 80 % < 90, break 10 % > 5 Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
This commit is contained in:
1 parent
fd8fc08603
commit
8e63b21e21
18 files changed
+1375
-76
No files matched your search
@@ -175,8 +175,8 @@ flowchart TD
|
||||
|
||||
### W2 Kanban
|
||||
|
||||
- [ ] Columns Waiting, Running and Done; no Blocked or Stopped column.
|
||||
- [ ] A blocked task carries a red Blocked label, a stopped one a grey Stopped
|
||||
- [x] Columns Waiting, Running and Done; no Blocked or Stopped column.
|
||||
- [x] A blocked task carries a red Blocked label, a stopped one a grey Stopped
|
||||
label in Done; `operator/*` rows are not on the board.
|
||||
- [ ] Swimlanes P1, P2, P3, P4+ and Unpinned, collapsible, Unpinned sorted by
|
||||
WSJF rank; Done cards older than 24 h hidden until shown.
|
||||
@@ -190,8 +190,8 @@ flowchart TD
|
||||
- [ ] Staged moves show at once as pending; "Apply n changes" signs them with
|
||||
one passkey; the host executor applies them through `rasci.py`, refuses
|
||||
a cycle or a `done` with an open key result, and the card shows why.
|
||||
- [ ] Each affected agent receives one post listing the operator's changes to
|
||||
its rows.
|
||||
- [x] Each affected agent receives one post listing the operator's changes to
|
||||
its rows that `rasci.py` applied, once the whole signed batch ended.
|
||||
- [ ] A click on a card opens its detail popup.
|
||||
|
||||
### W2 Forecast
|
||||
@@ -331,7 +331,7 @@ The work packages meet only through these interfaces:
|
||||
### Tests
|
||||
|
||||
- Unit:
|
||||
- [ ] Board staging, lanes and refusals (cycle, open key result); forecast
|
||||
- [x] Board staging, lanes and refusals (cycle, open key result); forecast
|
||||
fixed, growing and never; stale; scope without `operator/*`.
|
||||
- [ ] Gates resolve (own rule, strictest of several ancestors, none);
|
||||
parents derive; receipt tree sha with unstaged and untracked files;
|
||||
|
||||
Reference in new issue
Block a user